23-048 Melrose Terrace Reservoir Replacement Project
Post Date
Updated Date
Closing Time
The purpose of this Request for Proposal is to solicit submissions from qualified firms to replace the potable water reservoir at the Melrose Terrace Water Service Area. The work includes demolishing the existing bolted steel reservoir and design, material supply and construction of a new bolted steel reservoir. The work is intended to be completed between October 2023 – April 2024.
Submissions and Questions are to be directed to:
Rocky Chowdhury, M.Sc., P.Eng.
Project Engineer, Water Services
Email: rchowdhury@rdn.bc.ca