22-041 Whiskey Creek Transmission Main and Pump Station Construction
Post Date
Updated Date
Closing Time
The supply, installation and a new 75 mm Transmission main that connects the well site to the potable water reservoir and pump station. The pump station at the reservoir site will be upgraded to include new distribution pumps, piping and instrumentation which includes process and electrical work including the installation of a new owner-supplied generator.
Tender Inquiries are to be directed to the Owner's representative:
Jill Hardy, P.Eng., MPE Engineering Ltd.
Phone: 403-219-6319
Email: jhardy@mpe.ca
Documents