20-025 Whiskey Creek Production Wells, Booster Pump Station and Transmission Main RFP
Post Date
Closing Time
- Review all available related documents and complete a topographic survey to provide a base plan for design
- Review design requirements, including the draft functional description provided as Appendix B, and facilitate a meeting with RDN staff to discuss design options
Prepare a final functional specification, based on the draft functional specification provided
- Prepare 50% design drawings, a technical memorandum and a Class C Estimate for the well site, booster pump site, and transmission main