20-025 Whiskey Creek Production Wells, Booster Pump Station and Transmission Main RFP

Closing Time
  • Review all available related documents and complete a topographic survey to provide a base plan for design
  • Review design requirements, including the draft functional description provided as Appendix B, and facilitate a meeting with RDN staff to discuss design options
  • Prepare a final functional specification, based on the draft functional specification provided

  • Prepare 50% design drawings, a technical memorandum and a Class C Estimate for the well site, booster pump site, and transmission main